Public meeting: Wednesday, Sept. 28th at 6:00 PM regarding the final design and construction of the D&R Greenway Connector in Trenton. This project will formalize a Circuit Trail connection between the Wellness Loop in downtown Trenton, the Lower Trenton (aka Trenton Makes) Bridge, and South Trenton. Please see more details at the link below, including information on registering for the virtual public meeting.
Original source can be found here.